Scale Your CPMS Testing with True Digital Twins
Stop relying on slow, manual hardware testing. The Pionix Virtual Charger Park (VCP) lets CPOs and CPMS vendors instantly spin up thousands of EVerest-powered digital twins for massive load testing, CI/CD automation, and real-world scenario validation.
Massive Scalability
Spin up thousands of chargers of any type to stress-test your CPMS backends at scale.

Automated CI/CD
Integrate directly into your pipelines. Script tests, simulate plug events, and inject failures on every commit.
Deep Diagnostics
Override charger states, SSH into EVerest instances, and analyze real-time logs to catch hidden bugs.
100% Production Code
True digital twins running the exact EVerest stack deployed on hundreds of thousands of physical chargers worldwide.
Massive Scalability & Scenario Diversity
Spin up anything from a single AC charger to a massive, load-balanced HPC multi-satellite setup. Stress-test your backends with arbitrary charger types and configurations.
Automated CI/CD & API Control
Eliminate costly field pilots. Integrate the VCP into your CI/CD pipelines using side-channel APIs to script regression tests, simulate plug/unplug events, and inject emulated failures on every commit.
Eradicate Diagnostic Blind Spots
Go deeper than basic automated tests. Use the rich UI to override charger states, access remote SSH directly into EVerest instances, and analyze real-time log files to catch hidden bugs.
OCA Golden System under Test
Officially selected by the Open Charge Alliance as a Golden System under Test for quality assurance of their OCPP compliance testing tool (OCTT). Learn more at openchargealliance.org
Built on EVerest. Ready for Everything.
OCPP 1.6, 2.0.1 & 2.1 | ISO 15118-2 & -20 | Plug & Charge | Bidirectional/V2G | Megawatt Charging System (MCS).

See the Virtual Charging Park in action
Want to see how to stress-test your backend with massive HPC setups, automate regression testing, and run deep diagnostics with failure injections? Join our live Deep-Dive Webinar with Q&A.
📅 Wednesday, April 29th
Mark your calendar
🕔 17:00 CET
60 minutes including live Q&A
💻 Google Meet
Link sent upon registration
In this session, we will cover:
- Instantly spin up thousands of chargers to stress-test your backend
- Integrate VCP into CI/CD pipelines for automated regression testing
- Run deep diagnostics and inject emulated failures
- Live Q&A to answer all your technical questions
Solutions for the EV charging industry.
FAQs
Here are the most common questions about the Virtual Charging Park and how it supports your CPMS testing.
Stop guessing. Start testing with true digital twins.
Join the companies already ensuring their production environments are bulletproof with the Pionix Virtual Charging Park.

